Production manufacturing solution

Translate

Section 13 Repetitive Production and Setups

 Repetitive Production and Setups

So far we have accepted that a job has a duration of say, 7 hours, and we haven't worried about how the 7  hours has been estimated. Let's say the first job is to set up a work centre and then produce 500 of Product A. Work Centre 1 is an old machine which runs slowly, but is quick to set up, and Work Centre 2 is a new high speed machine, but the set ups take a long time. We would describe this in tables like this:


The left hand side of the schedule would look like this




Labels: Scheduling Excel Basic

Thanks for reading Section 13 Repetitive Production and Setups . Please share...!

0 Komentar untuk "Section 13 Repetitive Production and Setups "